Project: Geek   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Gary Phenning   -  
Project:   Kitfox - Series 7   -   VIEW REPORTS
Total Hours:1393.7
Total Flight Time:0.4
Start/Last Date:Mar 06, 2021 - Apr 06, 2024
Engine:Rotax 912is
Propeller:Whirlwind
Panel:Garmin G3x
 
Friendly URL: https://eaabuilderslog.org?s=Geek

Home or Last Project Picture

Jun 01, 2022     Elevator Rig - (7 hours)       Category: Controls
Rigged the elevator today. Book called for 20 degrees down elevator and 39 degrees up. I set mine up for 18 degrees down and 41 degrees up since reports from other pilots indicate that the Kitfox STi runs out of nose up authority on landing. Figured 18 down was more than enough to get the nose down on takeoff and 41 was just a little more I might like on landing. Set the control stick as required by the instructions at 80 degrees with the elevator in a neutral state. Installed the stop on the pitch servo for the autopilot so that at full elevator deflection, the arm just misses touching the stop by maybe 1/32nd of an inch.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.